Northeast Infrastructure conducted an electrical system evaluation and designed the replacement of the existing generator at a PennDOT maintenance garage. Design included demolition of existing generator and automatic transfer switch New 200KW diesel generator installed near service entrance to reduce distribution costs New service and...

Northeast Infrastructure designed a new 200kW (250kVA) outdoor full building propane generator system to match the rating of the existing building transformer. Generator replacement Electrical system evaluation to identify future loads New service and ATS Design of emergency system Coordination with medium voltage distribution   Location Clarks Summit...

Northeast Infrastructure identified electrical deficiencies in the 800,000 SF Wilkes-Barre VA Medical Center facility. Identified electrical deficiencies in the 800,000 SF facility Designed electrical systems to eliminate or correct identified deficiencies Replaced primary 12.47kV double -ended switchgear and four 15KV underground feeders with new duct...

480 volt 3-phase Generator provided to serve Building 24 at the Bath VA Medical Center. 480 volt 3-phase Generator provided to serve Building 24 Complete evaluation of existing system New generator designed to tie into building 24 at main service disconnect location Construction documents phased...

Northeast Infrastructure conducted circuit tracing and documentation of all electrical device end-points in 1.2 million SF of hospital space at the Manhattan VA Medical Center in Manhattan, NY. 13.2KV distribution feeders to 480 volt transformers as well as feeders to 208 volt transformer All branch...