34 Brown Street Honesdale, PA 18431
Mon – Fri: 8:30am – 5:00pm
570.253.0846
info@neinfra.com
Northeast Infrastructure designed a new 200kW (250kVA) outdoor full building propane generator system to match the rating of the existing building transformer.
Clarks Summit State Hospital, Abington Twp, PA