Northeast Infrastructure identified electrical deficiencies in the 800,000 SF Wilkes-Barre VA Medical Center facility.
- Identified electrical deficiencies in the 800,000 SF facility
- Designed electrical systems to eliminate or correct identified deficiencies
- Replaced primary 12.47kV double -ended switchgear and four 15KV underground feeders with new duct and manhole system
- Designed a new campus-wide lighting system
- Consolidated over 25 panel boards
- Replaced various disconnect switches and over-dutied panel boards with high rated AIC equipment
- New Fire Alarm System and emergency lighting
- Exit signage
- Arc Flash Study and short circuit and fuse relay study
- New Arc Flash labels placed on all equipment
- NEI supplied as-built plans