MODIFY WATER DISTRIBUTION SYSTEM

Category
Mechanical & Plumbing Projects
About This Project

NEI performed all design work and phasing to attain 100% compliance with VA Directive 1061.

  • Two buildings / 420,000 SF
  • NEI assessed and mapped all potable water distribution system (hot and cold), located and tagged all dead legs to be removed
  • Determined method of maintaining required water temperatures
  • Designed continuous monitoring systems to improve the hot water return systems – including re-sizing and replacing pumps
  • 320 day completion schedule
  • 762 Dead Legs identified
  • ICRA compliance
  • Night/weekend work to minimize interruption of patient care

 

Location

Wilmington, DE VA Medical Center