NEI performed all design work and phasing to attain 100% compliance with VA Directive 1061.
- Two buildings / 420,000 SF
- NEI assessed and mapped all potable water distribution system (hot and cold), located and tagged all dead legs to be removed
- Determined method of maintaining required water temperatures
- Designed continuous monitoring systems to improve the hot water return systems – including re-sizing and replacing pumps
- 320 day completion schedule
- 762 Dead Legs identified
- ICRA compliance
- Night/weekend work to minimize interruption of patient care
Location
Wilmington, DE VA Medical Center