PLUMBING STUDY

Category
Mechanical & Plumbing Projects
About This Project

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system.

  • NEI identified a total of 965 dead legs
  • NEI produced a full set of record plumbing drawings depicting existing layout of the entire domestic water system of the 15 buildings on the Castle Point campus. 521,000 SF
  • Prepared Design Development and Construction Documents
  • ICRA compliance
  • Retained services of in industrial hygienist for asbestos abatement
  • Night/weekend work to minimize interruption of patient care

 

Location

Castle Point, NY VA Medical Center