Design of a copper removal system for a WWTP with an average daily flow of 0.4 MGD
- NEI provided all A/E design, technical specifications, as-built documentation and cost estimates
- Electrical connections for sand filters backwash system
- New comminutor, including electrical and controls
- Replacement of exterior UV disinfection system
- NEI provided laboratory tests of soils around tanks for lead
Location
Lyons, NJ VA Medical Center