MODERNIZE WASTE WATER TREATMENT PLANT

Category
Mechanical & Plumbing Projects
About This Project

Design of a copper removal system for a WWTP with an average daily flow of 0.4 MGD

  • NEI provided all A/E design, technical specifications, as-built documentation and cost estimates
  • Electrical connections for sand filters backwash system
  • New comminutor, including electrical and controls
  • Replacement of exterior UV disinfection system
  • NEI provided laboratory tests of soils around tanks for lead

 

Location

Lyons, NJ VA Medical Center