PLUMBING AND MECHANICAL SYSTEM STUDY

Category
Mechanical & Plumbing Projects
About This Project

NEI performed a plumbing study to document the campus piping system and develop as-built documents to identify potential Legionella causing dead legs on the potable water distribution system.

  • This was a multi-phase operation that required NEI to access each floor, room, corridor, and area in 16 buildings totatling 997,000 SF.
  • Environmental services included testing and design abatement and remediation of asbestos and lead.
  • Identified 1,383 dead legs
  • 320 day design completion schedule
  • Night/weekend work to minimize interruption of patient care

 

Location

Northport, NY VA Medical Center