UPGRADE DOMESTIC WATER DISTRIBUTION SYSTEM

UPGRADE WATER SYSTEM & LEGIONELLA PREVENTION
Category
Mechanical & Plumbing Projects
About This Project

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system.

  • Provided record drawings depicting existing layout of the domestic water system in the 14-story building on the Shreveport campus.
  • NEI team accessed each floor, room, and corridor in 14-stories. 610,000SF
  • Identified over 200 dead legs
  • ICRA compliance
  • Night/weekend work to minimize interruption of patient care

 

Location

Shreveport, LA VA Medical Center