Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. A multi-phase project NEI team accessed each floor, room, corridor, and area in 13 buildings. 753,000 SF Identified over 331 dead legs ICRA compliance 120 day...

NEI performed a plumbing study to document the campus piping system and develop as-built documents to identify potential Legionella causing dead legs on the potable water distribution system. This was a multi-phase operation that required NEI to access each floor, room, corridor, and area in...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system.   Location Montrose, NY VA Medical Center ...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. NEI identified a total of 965 dead legs NEI produced a full set of record plumbing drawings depicting existing layout of the entire domestic water system...

NEI performed all design work and phasing to attain 100% compliance with VA Directive 1061. Two buildings / 420,000 SF NEI assessed and mapped all potable water distribution system (hot and cold), located and tagged all dead legs to be removed Determined method of maintaining...

Design of a copper removal system for a WWTP with an average daily flow of 0.4 MGD NEI provided all A/E design, technical specifications, as-built documentation and cost estimates Electrical connections for sand filters backwash system New comminutor, including electrical and controls Replacement of exterior...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the domestic water system in the 14-story building on the Shreveport campus. NEI team accessed each floor, room, and...

Field study to identify all cross connects and potential Legionella causing dead legs on the domestic water distribution lines. Provided record drawings depicting existing layout of the domestic water system on the Leeds Campus. NEI team accessed each floor, room, corridor, and crawl space on...

Northeast Infrastructure provided a site survey and feasibility design analysis for the creation of a new surface parking lot at the Palo Alto VA Medical Center. The new parking lot includes road access, exterior lighting, pedestrian circulation, landscaping, drainage, site utilities, way finding and regulatory...

Northeast Infrastructure conducted circuit tracing and documentation of all electrical device end-points in 1.2 million SF of hospital space at the Manhattan VA Medical Center in Manhattan, NY. 13.2KV distribution feeders to 480 volt transformers as well as feeders to 208 volt transformer All branch...