Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the entire domestic water system consisting of 37 buildings on the Fayetteville Campus NEI team accessed each floor, room,...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the domestic water system consisting of 7 buildings on the Batavia Campus. NEI team accessed each floor, room, and...

Northeast Infrastructure provided a site survey and feasibility design analysis for the replacement and expansion of the parking lot at the James J. Peters VA Medical Center in Bronx, NY. Provided programming for maximizing the number of parking spaces Assessed environmental impact of new drainage...

Northeast Infrastructure conducted an electrical system evaluation and designed the replacement of the existing generator at a PennDOT maintenance garage. Design included demolition of existing generator and automatic transfer switch New 200KW diesel generator installed near service entrance to reduce distribution costs New service and...

Northeast Infrastructure designed a new 200kW (250kVA) outdoor full building propane generator system to match the rating of the existing building transformer. Generator replacement Electrical system evaluation to identify future loads New service and ATS Design of emergency system Coordination with medium voltage distribution   Location Clarks Summit...

Northeast Infrastructure identified electrical deficiencies in the 800,000 SF Wilkes-Barre VA Medical Center facility. Identified electrical deficiencies in the 800,000 SF facility Designed electrical systems to eliminate or correct identified deficiencies Replaced primary 12.47kV double -ended switchgear and four 15KV underground feeders with new duct...

480 volt 3-phase Generator provided to serve Building 24 at the Bath VA Medical Center. 480 volt 3-phase Generator provided to serve Building 24 Complete evaluation of existing system New generator designed to tie into building 24 at main service disconnect location Construction documents phased...

Field study to identify all cross connects and potential Legionalla causing dead legs on the domestic water distribution lines. Provided record drawings depicting existing layout of the domestic water system serving 8 buildings on the East Orange Campus NEI team accessed each floor, room, corridor,...

Upgrade of aged parts/systems related to the plumbing system to ensure a safer and more reliable water supply. This project is a continuation of Phase I which provided vertical risers to all floors in the hospital and capped off at each floor. Phase II provides all...

Upgrade of exterior water piping and sanitary sewer systems. Topographic Survey of existing water line location. Ground penetrating radar used to determine location of existing UG utilities near the existing water line Site surey and infestigation, load and sizing calculations, concept development, design development, preliminary...