Archive

Design of a copper removal system for a WWTP with an average daily flow of 0.4 MGD NEI provided all A/E design, technical specifications, as-built documentation and cost estimates Electrical connections for sand filters backwash system New comminutor, including electrical and controls Replacement of exterior...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the domestic water system in the 14-story building on the Shreveport campus. NEI team accessed each floor, room, and...

Field study to identify all cross connects and potential Legionella causing dead legs on the domestic water distribution lines. Provided record drawings depicting existing layout of the domestic water system on the Leeds Campus. NEI team accessed each floor, room, corridor, and crawl space on...