Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the entire domestic water system consisting of 37 buildings on the Fayetteville Campus NEI team accessed each floor, room,...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. Provided record drawings depicting existing layout of the domestic water system consisting of 7 buildings on the Batavia Campus. NEI team accessed each floor, room, and...

Field study to identify all cross connects and potential Legionalla causing dead legs on the domestic water distribution lines. Provided record drawings depicting existing layout of the domestic water system serving 8 buildings on the East Orange Campus NEI team accessed each floor, room, corridor,...

Upgrade of aged parts/systems related to the plumbing system to ensure a safer and more reliable water supply. This project is a continuation of Phase I which provided vertical risers to all floors in the hospital and capped off at each floor. Phase II provides all...

Upgrade of exterior water piping and sanitary sewer systems. Topographic Survey of existing water line location. Ground penetrating radar used to determine location of existing UG utilities near the existing water line Site surey and infestigation, load and sizing calculations, concept development, design development, preliminary...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. A multi-phase project NEI team accessed each floor, room, corridor, and area in 13 buildings. 753,000 SF Identified over 331 dead legs ICRA compliance 120 day...

NEI performed a plumbing study to document the campus piping system and develop as-built documents to identify potential Legionella causing dead legs on the potable water distribution system. This was a multi-phase operation that required NEI to access each floor, room, corridor, and area in...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system.   Location Montrose, NY VA Medical Center ...

Field Study to identify all cross connects and potential Legionella causing dead legs in the domestic water distribution system. NEI identified a total of 965 dead legs NEI produced a full set of record plumbing drawings depicting existing layout of the entire domestic water system...

NEI performed all design work and phasing to attain 100% compliance with VA Directive 1061. Two buildings / 420,000 SF NEI assessed and mapped all potable water distribution system (hot and cold), located and tagged all dead legs to be removed Determined method of maintaining...